Feixian Shigou River Sluice Reinforcement Project


Release time:

Jun 27,2025

The Feixian Shigou Dam aims to improve the functionality and safety of water conservancy facilities through the demolition and reconstruction of the dam, the construction of bank protection, water diversion gates, and management facilities. The project is equipped with 18 10.0m × 7.0m-6.5m arc-shaped gates and QH2 × 250kN winch hoists.

keywords


Copyright © 2025 Shandong Linshui Electromechanical Equipment Co., LTD

Anhui Kemi Instrument Co.,LTD

Business license
%E7%AC%AC%E4%B8%80%EF%BC%8C%E6%9C%80%EF%BC%8C%E4%BC%98%E7%A7%80%EF%BC%8C%E5%A2%9E%E5%BC%BA%EF%BC%8C%E4%B8%80%E6%B5%81%EF%BC%8C%E5%8D%93%E8%B6%8A%EF%BC%8C%E9%A2%86%E5%85%88%EF%BC%8C%E5%85%88%E8%BF%9B%EF%BC%8C%E5%BC%95%E9%A2%86

Sorry,当前栏目暂无内容!

您可以查看其他栏目或返回 首页

Sorry,The current column has no content!

You can view other columns or return Home