Linyi City Shennihe East Gaodu Steel Dam Sluice Project


Release time:

Jul 06,2026

The construction of a new sewage interception gate in the Shenni River belongs to the water environment improvement project of the Shenni River channel. The project adopts three 20m × 4.8m steel dam gates and a YQDZY-1250 kN-4300 hydraulic hoist, which can effectively solve the problem of sewage overflow along the line and achieve remote opening of the gate and dam for flood discharge during the flood season, ensuring the maximum benefits of sewage interception and flood prevention.

keywords


Copyright © 2025 Shandong Linshui Electromechanical Equipment Co., LTD

Anhui Kemi Instrument Co.,LTD

Business license
%E7%AC%AC%E4%B8%80%EF%BC%8C%E6%9C%80%EF%BC%8C%E4%BC%98%E7%A7%80%EF%BC%8C%E5%A2%9E%E5%BC%BA%EF%BC%8C%E4%B8%80%E6%B5%81%EF%BC%8C%E5%8D%93%E8%B6%8A%EF%BC%8C%E9%A2%86%E5%85%88%EF%BC%8C%E5%85%88%E8%BF%9B%EF%BC%8C%E5%BC%95%E9%A2%86

Sorry,当前栏目暂无内容!

您可以查看其他栏目或返回 首页

Sorry,The current column has no content!

You can view other columns or return Home