SHANDONG LINSHUIELECTROMECHANICAL EOUIPMENT CO., LTD
Hot News
Pengdaokou diversion gate
Release time:
Jul 10,2025
Pengdaokou is a part of the Yimo River Basin, with rich water conservancy history and culture. The flood diversion gate is an open structure with a total of 19 holes, each with a net width of 10m and a total width of 213.4m.
keywords
Hot News